Preparation of Topology Changes for Low Frequency (LF) Gateways
Preparation of Topology Changes for Low Frequency (LF) Gateways
As previously described in the T7 Release 8.0 Release Notes, Deutsche Börse is planning to make some Topology Changes for the Low Frequency (LF) Gateways in early 2020.
In preparation for these topology changes the necessary changes in the network access to the LF gateways will be made in advance on two separate weekends. During each weekend only one side of the exchange infrastructure will be changed:
- Side A LF gateways will be changed on 19. October.
- The change for Side B LF gateways is currently planned for 26. October but will be confirmed on a later stage.
Please refer to the document N7 Network Access Guide (Page 74) to ascertain which network addresses are associated with which side of the infrastructure. The document is published on the Xetra website (www.xetra.com) under the path
System Documentation > Release 8.0 > Network Access
Resulting from the network changes, the LF gateways will be connected directly to the distribution layer switch in the co-location 2.0 network and access to the LF gateways will therefore be similarly as fast as the access to Partition Specific (PS) gateways. The impact on latency resulting from the changes will be as follows:
- Co-location 2.0 (10Gbit/s) access via LF gateways will be ≈30µs faster than before
- Please Note: Access to the LF gateways from the correct network side (A/B) will be more important than before. The penalty for accessing “A” LF gateways via a co-location 2.0 “B” line (and vice-versa) is ≈50µs